1 power connection method:
General LED lamp with voltage is DC 12V, necessitating the use of switching power supply, power supply according to the size of the power LED lamp belt and connected to fixed length. If you do not want to take each LED lamp with a power to control, switching power supply can buy a relatively large power for the total power supply, then put all LED light with all input power in parallel (wire size is not enough, can also extend) unified by the total power switch. The advantage is that you can focus on the control, the place is not convenient to achieve a single LED lights with the lighting effect and switch control, which can be measured in a specific way.
2 per meter with the "scissors" tag, can only be cut in the mark, the wrong cut or cut offset will lead to one meter is not bright! It is best to look carefully before the cut at the lower marking position, according to local cut off without a connection.
Note 3 connection distance LED light belt:
General, LED lamp 3528 series with its connection with the longest distance is 20 meters, LED lamp 5050 series with the longest connecting distance is 15 meters. If the distance beyond the connection, the LED lamp belt is easy to heat, the use of the process will affect the service life of the LED lamp belt. Therefore, the installation must be installed in accordance with the requirements of manufacturers, do not let the LED lamp with overload operation.
4 each lamp must be equipped with a special plug (plug with transformer), the connection must be transparent plastic cover removed, then try again after the lamp cover. Must not be directly connected with the lid, so easy to short circuit!
5 outdoor installation:
Outdoor lighting installation because will withstand the wind and rain, if the use of fixed 3M glue, a long time will cause the decrease of the 3M adhesive LED lights off, so often used for outdoor installation fixed card slot, need to cut and connected place, method and indoor installation, just need another with waterproof glue, waterproof effect to consolidate the connection point.
6 indoor installation:
LED lights for indoor decoration, because of not having to undergo the installation is very simple so exposed to wind and rain. With appropriate LED light beauty electronic production belt as an example, behind each LED lamp belt are affixed with self-adhesive 3M double-sided adhesive, the installation can be directly off the surface of the 3M double-sided adhesive stickers, and then the lamp strip is fixed on the installation place, hand press flat is good. As for some places need a corner or long how to do? Very simple, LED lamp belt is 3 LED as a set of serial parallel circuit structure, each of the 3 LED that can be cut alone.
7 controller connection:
Marquee LED band and RGB all lights with need to use the controller to achieve varying effect, while the control distance of each controller is not the same, in general, simple controller for 10 control distance to 15 meters, distance control remote controller is 15 to 20 meters, the longest can be controlled to a distance of 30 meters. If the LED lamp is connected with a long distance, and the controller can not control the length of the lamp belt, then need to use a power amplifier to tap.
8 lights installed, generally placed in the light trough, straight on it, also can be fixed with a cord or wire. If it is necessary to install or vertical installation, the need for additional wind clip and tail plug. Original clip is fully transparent, we do not give ~ if it is installed in the open air, it is best to install the end of the plug and plug at the end of the waterproof glass glue, waterproof performance is better.
LED lamp belt at the time of installation, must be in accordance with the concise, use the correct method to carry out the installation, if excessive distortion or incorrect use of the installation method, are easy to light with losses, reduce the lamp with the use of time, is not conducive to the maintenance of lights, in the lights of the installation, we must keep in mind the above points.
Contact: mack
Phone: 13332979793
E-mail: mack@archled.net
Add: 3rd Floor, Building A, Mingjinhai Second Industrial Zone, Shiyan Street, Baoan, Shenzhen,Guangdong,China